          manual activities per hectare in each process, as well as the
          yield from the respective operations, it is possible to calculate                                   pxhere.com
          the production costs for harvesting and transportation.
            Similarly,  these  costs  can  be  calculated  during  the
          implementation  and  management  of  stands  to  contextualise
          the total expenditure of the forestry enterprise.

            Revenue can be measured based on the price per cubic
          metre of timber at the mill and the volume per hectare. Through
          revenues and costs, it becomes possible to determine economic
          indicators based on an interest rate.
            The indicators normally used in the economic analysis of
          forestry projects are Net Present Value (NPV), Internal Rate
          of Return (IRR), Average Production Cost (APC), and Periodic   separately, without integrating deterministic economic indicators,
          Equivalent Value (PEV).                            probabilistic  risk  assessment,  sensitivity  analysis,  and  the
            Regarding risks, any event involving a degree of uncertainty   identification  of  operational  threshold  values  within  a  single

          must  have  its  probability  established  to  achieve  a  more   project-level decision-support framework.
          assertive  decision-making  process.  The  input  variables  for   In this context, the present study contributes by integrating
          economic  risk  modelling  must  be  considered  potential  cost   operational  cost  components,  transport  logistics,  and  Monte
          influencers, justifying an analysis focused on forest harvesting   Carlo-based risk analysis into a single economic framework,
          and transportation activities.                     enabling the identification of critical thresholds and managerial
            Depreciation and fuel are considered strategic among the   limits related to transportation distance, timber price, land cost,
          most  significant  operational  cost  components  in  harvesting,   and wood productivity.

          as  they  represent  a  significant  portion  of  fixed  and  variable   This study aimed to conduct a deterministic and probabilistic
          costs, respectively. In addition to these factors, transportation   economic analysis for a eucalyptus reforestation project using
          distance  and  labour  costs  also  significantly  influence  forest   feasibility indicators. The strategic cost and revenue components
          transportation costs.                              of  the  forest  harvesting  and  transportation  process  were
            Previous  studies  have  demonstrated  the  importance  of   considered as input variables for risk modelling.
          deterministic economic indicators, such as NPV and IRR, for
          evaluating the financial viability of forestry investment projects.   Study Area And Operational System
            Monte Carlo simulation has been incorporated into forestry   Data were collected from October to December 2024 on a
          economic  analyses  to  quantify  uncertainty  and  estimate  the   property located in the rural area of Viçosa, MG, Brazil, with

          probability  of  investment  success  under  different  production   22 hectares of planted Eucalyptus (Eucalyptus urophylla ×
          scenarios.                                         Eucalyptus grandis).
            In parallel, sensitivity analyses have been applied to identify   The  transportation  distance  between  the  forest  and  the
          the variables with the greatest influence on project performance   factory was 69 km, consisting of 64 km of asphalted roads and
          and economic risk.                                 5 km of gravel roads. Considering the round-trip transportation
            However, these studies have generally addressed economic   cycle, the total distance travelled was 138 km.
          evaluation, risk analysis, logistics, or supply chain optimisation   The climate in the region is classified as Cwb according to
   50   51   52   53   54   55   56   57   58   59   60